Feb 8, 2021 (posted viaProZ.com): Plan d'Action pour la promotion et la protection des droits de l'homme, French to English, 102 pages, for a Government Ministry ...more »
French to English: answers General field: Other Detailed field: Construction / Civil Engineering
Source text - French Reponse 1
- Les règles définies par le dernier POS (Plan d’Occupation des Sols) de Yaoundé de 2015 et le Certificat d’Urbanisme, sont les règles qui prévalent au Cameroun en matière d’urbanisme.
Le POS est un document général à Yaoundé et le Certificat d’Urbanisme est un document délivré pour chaque terrain afin de définir et sertir les constructions sur ce dernier.
La réglementation française ne peut être appliquée à ce niveau compte tenu de ses spécificités urbaines propres à la France.
- Cette règlementation est légère et nous vous conseillons de l’appliquer. Il va sans dire que le contexte de Jamot est un contexte urbain contrairement à Mfou qui est du semi-rural. La réglementation retenue est celle de Yaoundé.
L’effectif projeté classe l’hôpital Jamot dans un Etablissement Recevant du Public (ERP) de 3eme catégorie (301 à 700 personnes, public et personnel) et 4eme catégorie (moins de 300 personnes) pour Mfou.
- Les couloirs qui ont de 3m de large sont suffisamment larges. Les escaliers sont de 1,50m (trame) et doivent mesurer 1,40m minimum de passage. Ceci pour répondre au passage des brancards et à l’évacuation. Nous soulignons le fait que le nombre des escaliers est insuffisant et que aucune issue de secours donnant sur l’extérieur n’est visible. Par ailleurs le niveau de plans de MFOU ne permet pas de juger les escaliers ni les issues de secours extérieures car ils n’y sont pas clairement implantés.
- Le projet devra être accompagné d’une notice de sécurité validée par le service des sapeurs-pompiers, organisme habilité à vérifier la réglementation camerounaise en matière d’évacuation. Cette réglementation est basée sur la réglementation française. A ce stade il est impossible de se prononcer car nous n’avons pas l’effectif exact du personnel travaillant dans les locaux ni les flux des usages.
Reponse 2
- Ces données sont spécifiques à Jamot Yaoundé mais pas à Mfou. Ce sont des règles générales qui englobent tous types de projets de construction recevant du public.
- 7m de large est la largeur requise pour toute route intérieure à double circulation.
- 16m est la hauteur maximale indiquée sur le Certificat d’Urbanisme. Une dérogation doit être demandée au niveau de l’avant-projet pour modification du Certificat d’Urbanisme avant le dépôt du Permis de Construire.
- 16m est le point le plus haut des constructions par rapport au niveau 0 du sol pas du sous-sol.
- L’espace maximal au sol comprend les surfaces données par limites de l’implantation des bâtiments.
- Mfou ne présente aucun souci à ce sujet.
- La compréhension des retraits 5m par rapport à la route et 3m par rapport aux limites mitoyennes est juste.
- Les parcelles concernées ont plus de 15m de profondeur.
- La route d’accès venant de l’extérieur doit avoir 12m de large minimum.
Reponse 3
- L’espace de stationnement est obligatoire sous ces formes d’exigence.
- Les lits concernent l’ensemble des lits de l’hôpital.
Reponse 4
- Au niveau de la Communauté Urbaine de Yaoundé, une commission siège tous les mois afin de délibérer sur les dossiers reçus avant.
- Fort de son expérience au Cameroun depuis près de 40 ans, Egis est bien disposé à vous accompagner dans le montage du dossier en vue de l’obtention du permis de bâtir.
Reponse 5
- Ce n’est pas le total qui fait 2 m, mais chaque passage piétonnier doit avoir 2m de large.
Reponse 6
- Pour ce type de construction nous vous conseillons une station d’épuration afin d’être indépendant en amont des réseaux publics. La connaissance de ces réseaux n’est pas précise.
Reponse 7
- Les câbles peuvent être installés en aérien sous réserve du résultat de l’étude d’impact environnemental obligatoire.
Reponse 8
- Les câbles peuvent être installés en aérien sous réserve du résultat de l’étude d’impact environnemental obligatoire.
- Oui. Un accès supplémentaire est nécessaire.
- 53 314 sqm/36 000 sqm SHON = 1,48 Le rapport doit être de 2,1 minimum. S’il y avait moins de m² bâtis, le chiffre serait plus proche de 2,1.
- Nous avons compte les lits sur les plans. Le nombre est plus important que celui annonce.
- Les escaliers d’urgence doivent être positionnés tous les 30m si pas d’ascenseurs, tous les 40m si ascenseurs. Nous ne connaissons pas la capacité des ascenseurs.
- Nous ne pouvons-nous prononcer sur la validation des évacuations que si nous avons un plan des flux du personnel et des patients.
- Certaines chambres ont l’implantation des fenêtres cote fenêtres.
Translation - English Answer 1
- The rules laid down by the last 2015 FAR (Floor Area Ratio) of Yaounde and the town planning certificate are the town planning regulations in force in Cameroon.
The FAR is a general document for Yaounde while the town planning certificate is a document issued for every plot; to define and set out construction works on the said plot.
French regulations cannot be applicable at this level given the town planning features specific to France.
- These regulations are less strict and we advice you to apply them. It goes without saying that Jamot is located in a town setting unlike Mfou which is situated in a semi-rural setting. The regulations applicable are those of Yaounde.
The numbers envisaged classify the Jamot hospital as a 3rd category Place of Assembly (POA) with 301 to 700 persons (public and staff) and the Mfou hospital as 4th category with less than 300 persons.
- The corridors which are 3m wide are sufficiently spacious. The stairs are 1.50m (frame) and should measure 1.40m minimum for the passage. This is to give way for stretchers and enable evacuation. We underscore the fact that the number of stairs is insufficient and that there is no visible emergency exit which faces outside. Furthermore, the design drawings of Mfou does not allow one to assess either the stairs or external emergency exits because they are not clearly set out.
- The project should be accompanied by a security notice approved by the fire-fighting department which is the body in charge of verifying Cameroon's regulations on evacuation. This regulation is drawn from the French regulation. At this stage, one cannot express an opinion because we neither know the exact number of staff working on the premises nor the approximate number of users.
Answer 2
- These data are specific to Jamot Yaounde but not to Mfou. They include general rules that apply to all types of construction projects open to the public.
- 7m is the width required for all domestic two-way roads.
- 16m is the maximum height specified in the town planning certificate. A waiver must be requested while preparing the draft to modify the town planning certificate before filing for the building permit.
- 16m is the highest point of construction from the floor level of the land and not of the underground.
- The maximum floor space includes the surface area given from the boundaries of the setting out of buildings.
- Mfou falls within norms as far as this is concerned.
- The explanation of the 5m distance from the road and 3m from the average boundaries is correct.
- The plots concerned are over 15m deep.
- The access way from outside should be 12m large minimum.
Answer 3
- Parking space is mandatory under such requirements.
- The beds refer to all beds in the hospital.
Answer 4
- At the Yaounde City Council, a committee meets every month to decide on files submitted before.
- Thanks to its experience in Cameroon for about 40 years now, Egis is well placed to assist you prepare the file in a bid to obtain the building permit.
Answer 5
- Each pedestrian path must be 2m wide and not all the pedestrian paths combined.
Answer 6
- For such construction works, we propose that you have a treatment plant so as to be independent of the public networks. Mastery of these networks is not accurate.
Answer 7
- Cables can be installed overhead pending the results of the obligatory environmental impact study.
Answer 8
- Cables can be installed overhead pending the results of the obligatory environmental impact study.
- Yes. Additional access is necessary.
- 53 314 m2 /36 000 m2 SHON = 1,48 The distance should be 2.1 minimum. If there was less m2 of built environment, the figure would be closer to 2.1.
- We counted the beds on the designs. The number is larger than indicated.
- Emergency stairs should be found after every 30m if there are no lifts and after every 40m if there are lifts. We do not know the capacity of the lifts.
- We can only talk about the authenticity of evacuations if we have a plan of the approximate number of staff and patients.
- Some rooms have windows set out facing other windows.
More
Less
Translation education
Master's degree - Advanced school of translators and Interpreters (ASTI), University of Buea
Experience
Years of experience: 12. Registered at ProZ.com: Feb 2019.
If we
all understand one another, the world would be a better place; more peace,
equal opportunities, greater success.
Hence my
passion for bridging language-related
communication barriers.
You need
someone who is diligent, attentive to detail, works efficiently under pressure
and delivers in time. That’s me. I acquired these skills while studying as a
mother (completing demanding assignments) and eventually working as a freelance translator/Interpreter.
In
addition, I learned to multitask and manage my time effectively. I learn
continually as I strive to read everyday; first as a hobby and then as a duty
to show my kids the example and raise them to find joy and knowledge in
investing in books rather than in television or social media. With this, I
constantly horn my skills and perfect my job.
Moreover,
with an MA in Translation and Interpretation
as well as over 7 years experience
in translation in several domains (law,
health, insurance, finance, media, general administration), I have a sound
academic profile and seasoned expertise to back my skills.
My mastery and use of
CAT tools (SDL Trados, Wordfast Pro) guarantees the integrity of your documents
by preserving the formats.
Keywords: French to English, translator, interpreter, legal, medical, financial, insurance, accurate, delivers projects in time, conference interpretation. See more.French to English, translator, interpreter, legal, medical, financial, insurance, accurate, delivers projects in time, conference interpretation, simultaneous, consecutive, whispering, . See less.